Ensurepass

QUESTION 21

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. A user accidentally deletes a file from version control. You need to restore the deleted file to version control. What should you do?

 

A.

Add a file with the same name in the same place in source control as the old file.

Right-click the file in the source control explorer and select Rollback.

Roll back the file to a change set right before the file was deleted.

B.

In Visual Studio 2012 click Tools, then click Options.

Expand the Source Control option, select Visual Studio Team Foundation, and then select Show deleted items in the Source Control Explorer.

Right-click the file in Source Control Explorer and select Rollback.

Roll back the file to a changeset right before the file was deleted.

C.

In Visual Studio 2012 click Tools, then click Options.

Expand the Source Control option and select Visual Studio Team Foundation, then select Show deleted items in the Source Control Explorer.

Right-click the file in Source Control Explorer and select Advanced, then select Get Specific Version.

Select a version of the file created right before the file was deleted.

D.

In Visual Studio 2012 click Tools, then click Options.

Expand the Source Control option and select Visual Studio Team Foundation, then select Show deleted items in the Source Control Explorer.

Right-click the file in Source Control Explorer and select Undelete.

 

Correct Answer: D

 

 

QUESTION 22

Your network environment includes a multi-tier Microsoft Visual Studio Team Foundation Server (TFS) 2012 server implementation. Developers use Visual Studio 2012.

 

Your team has just started developing a very large enterprise-scale application.

 

You need to create a workspace for the new project that meets the following requirements:

 

clip_image002Developers should be able to use Visual Studio 2012 and earlier versions to work with the workspace.

clip_image002[1]Performance of the workspace should not be degraded when the number of items in the workspace increases.

clip_image002[2]The storage utilization of the developer local hard drive should be as minimal as possible.

 

What should you do?

 

A.

Create a hybrid workspace.

B.

Create a server workspace.

C.

Create a server workspace and a Local workspace. Configure synchronization between both, and allow developers to utilize the local workspace.

D.

Create a local workspace.

 

Correct Answer: B

 

 

QUESTION 23

Your network environment includes two Microsoft Visual Studio Team Foundation Server (TFS) 2012 servers. A remote site has two teams. Each team uses a different TFS instance. The developers at the remote site experience poor performance due to network bandwidth issues. You need to relieve bandwidth by configuring Team Foundation server with the minimal components. What should you do?

 

A.

Install an IIS Server at the remote site and add Output Caching Rules to the IIS instance.

Change user configurations at the remote site to use IIS server.

B.

Install a single TFS Proxy instance at the remote site, adding<;Serve>; tags in TFProxy Proxy.contiq for each server instance.

Point all users at the remote site to the TFS Proxy server.

C.

Install a third TFS Server and move the projects that are used by the remote team from existing servers to the third server.

Point all users at the remote site to the new server.

D.

Install a TFS Proxy server instance for each project team.

Point users from each project team at the respective TFS Proxy server.

 

Correct Answer: B

 

 

QUESTION 24

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) server. You are performing capacity planning for three teams of developers. Each team is developing a different software module. Developers belong to only one team. You need to ensure that team members can edit only the work items of the module on which they are working. What should you do?

 

A.

Create three teams under the Team Project for team members of three modules.

On the Security tab of the team give Edit work items in this node permission to that team for the corresponding area.

Deny that permission to other two teams.

B.

Create three TFS groups at the Team Project level for team members of three modules.

Create three areas for the three modules.

For each area, on the Permissions tab of the groups, give Edit work items in this node permission to the group corresponding to that area.

Deny that permission to other two groups.

C.

Create one TFS group at the Team Project level for the team members of the three modules.

Create three areas for the three modules. For each area, give Edit work items in this node permission to the group.

D.

Create three teams under the Team Project for team members of three modules.

For each area corresponding to the team, give Edit work items in this node permission to that team.

Deny that permission to other two teams.

 

Correct Answer: D

 

 

QUESTION 25

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Your development team has a Visual Studio solution file that is used to build a software product. A developer reports that when he retrieves the latest source file to his computer from TFS and performs a build, the build frequently breaks. You need to provide a solution that prevents check-ins to TFS that will break developers’ builds. What should you do?

 

A.

Configure a Team Build for the project and set the build trigger to Continuous Integration. Then modify the build template to automatically roll back check-ins from failed builds.

B.

Configure a Team Build for the solution and set the trigger to Gated Check-in.

C.

Configure a Team Build for the solution and set the trigger to Schedule. Then modify the build template to automatically roll back check-ins from failed builds.

D.

Configure a Team Build for the project and set the build trigger to Continuous Integration.

 

Correct Answer: B

 

 

QUESTION 26

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. You create a new project using the default Visual Studio Scrum 2.0 template. You want to inform the product owner when a Product Backlog Item (PBI) is ready for testing. You need to ensure that when the development of a PBI has been completed, the tester is able to change the state of the item to be Ready for Acceptance Testing. You need to achieve this goal without developing custom code. What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)

 

A.

Use the TFSFieldMapping command to map a new state for Product Backlog Item.

B.

Use the Visual Studio Process Template editor to modify the Product Backlog Item template.

C.

Write a Visual Studio Extension (VSIX) so developers can change the state in Visual Studio.

D.

Modify the Product Backlog Item template XML and use the witadmin command to import the modified XML.

 

Correct Answer: BD

 

 

QUESTION 27

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Developers use Visual Studio 2012.

 

You want to modify the build definition deployment process.

 

You need to meet the following requirements:

 

clip_image002[3]The process will stop new builds from being started while making the modifications.

clip_image002[4]Builds should queue up while modifications are being made.

clip_image002[5]Once modifications are complete, all queued builds should be processed.

 

What should you do?

 

A.

Set the build controller’s Processing property to Paused. Once maintenance has been completed, reset the property back to its original value.

B.

Set the build definition’s Queue Processing property to Paused for each of the build definitions being modified. Once maintenance has been completed, reset the property back to its original value.

C.

Set the build definition’s Queue Processing property to Disabled for each of the build definitions being modified. Once maintenance has been completed, reset the property back to its original value.

D.

Set the build controller’s Processing property to Disabled, Once maintenance has been completed, reset the property back to its original value.

 

Correct Answer: B

 

 

QUESTION 28

You are business analyst. You use MS Excel to add and edit work items of a team project. You store those work items in an offline worksheet. Recently your team project has been moved to another Team Project Collection. You need to connect the Microsoft Excel document containing the work items to the new Team Project Collection. What should you do from within Microsoft Excel?

 

A.

Click the Publishing button on the Work Items group within the Team tab.

When prompted, select the new name of the Team Project Collection.

B.

Click the Refresh button on the Work Items group of the Team.

When prompted, select the new name of the Team Project Collection.

C.

Use the Server Connection option in the Configure dropdown of the Work Items group of the Team tab.

When prompted, select the new name of the Team Project Collection.

D.

Disconnect from TFS from within the Team tab.

Reconnect to TFS from within the Team tab.

While reconnecting, provide the new name of the Team Project Collection when prompted.

 

Correct Answer: C

 

 

QUESTION 29

Your network environment includes a single Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. You are using the Default Template to build a solution that will be debugged by using IntelliTrace. You need to ensure that symbols will be available to IntelliTrace for each build. Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)

 

A.

Update the build definition to set IndexSources to True.

B.

Set up a UNC path to the symbol location (for example, \\sharename\symbols) and grant Full Control permissions to the user account under which the build agent is running.

C.

Configure the build trigger for Continuous Integration.

D.

Add the UNC path to the build’s list of working folders.

E.

Update the build definition by configuring the UNC path to Publish Symbols.

 

Correct Answer: ABC

 

 

QUESTION 30

Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. You are configuring a set of automated build servers for TFS that includes one build controller and four build servers, with TFS Build Agents installed on each. All build servers are configured with the same base set of software. You have a software component that is licensed for a single build server and can be installed on only one build machine. You need to configure a set of build definitions that rely on this software component to utilize the correct build machine. What should you do?

 

A.

Add the name of the software component and the name of the build agent it is installed on to the Installed Components list in the build controller properties. In the build definition, add the name of the software component to the Required Components list.

B.

Add a tag to the build agent (indicating which machine has the software installed) and reference this tag in the Tags Filter setting for the build definition that uses the software.

C.

Add a tag to the build agent (indicating which machine has the software installed) and reference this tag in the Name Filter setting for the build definition that uses the software.

D.

Add the name of the software component to the Installed Components list in the build agent properties. In the build definition, add the name of the software component to the Required Components list.

 

Correct Answer: B

 

Instant Access to Download Latest Complete Collection of Microsoft 70-496 Real Exam

Try Microsoft 70-496 Free Demo