Dumps4cert.com : Latest Dumps with PDF and VCE Files
2018 Jan IBM Official New Released C2180-606
100% Free Download! 100% Pass Guaranteed!
http://www.Dumps4cert.com/C2180-606.html

IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design

Question No: 1 – (Topic 1)

Which steps would a process analyst take whenconducting a simu-lation of quot;what-ifquot; scenarios for a business process instance?

  1. Make a copy of the simula-tion snapshot, rename it, change the attributes for the quot;what- ifquot; scenario and re-run the simula-tion and analyze the results

  2. Make a copy of the simula-tion profile, rename it, change the simula-tion attributes for the quot;what-ifquot; scenario and re-run the simula-tion and analyze the results.

  3. Right click on the simula-tion profile, select Profile Analysis gt; New Profile and change the attributes for the quot;what-ifquot; scenario and then re-run the simula-tion and analyze results

  4. Right click on the simula-tion snapshot, select Profile Analysis gt; Profile Specification, and change the attributes for the quot;what-ifquot; scenario and then re-run the simula-tion and analyze results.

Answer: B

Question No: 2 – (Topic 1)

A process analyst has completed a process model and is required to validate it. One of the validations is to ensure that there are no potential situations where a sequence of activities can be repeated indefinitely. Using Static Analysis, how can the process analyst quickly validate that there are no sequence of tasks that can potentially loop endlessly?

  1. 1. Run the Path Cycles Report.

    2. Identify the cycle name assigned to each path cycle in theprocess and correlate that back to the process model.

  2. 1. Run the Activity Throughput Report.

    2. Identify the throughput of all activities that deliver more outputs per hour than anticipated.

  3. 1. Run the Activities Unable to Start Report.

    2. Identify any activities that were not able to be invoked within the process, locate the preceding construct that connects a downstream activity#39;s output to an upstream activity#39;s input.

  4. 1. Run the Paths Unable to be Followed Report.

  1. Identify any paths that were not able to be invoked within the process, and locate the preceding construct that connects a downstream activity#39;s output to an upstream activity#39;s input.

    Answer: A

    Question No: 3 – (Topic 1)

    A process analyst runs a simu lation that yields inaccurate results. Which analysis would a process analyst use to identify looping paths in the process?

    1. Path Cycles

    2. Activity Throughput

    3. Activities Unable to Start

    4. Paths Unable to be Followed

Answer: A

Question No: 4 – (Topic 1)

A process analyst is simulatinga process and the results indicate excessive wait times at some of the activities. Which static analysis report would be useful in determining the cause of the excessive wait times?

  1. Activities by organization

  2. Activity cost and duration

  3. Activityresource and role leveling

  4. Qualified resources for role

Answer: C

Question No: 5 – (Topic 1)

A process analyst is performing quot;What-Ifquot;analysis upon a process model using simu lation. Work can arrive into the process at anytime. It has been observed that the 5 defined Field Technician resources have significant resource shortage durations. The process analyst assumes that making more Field Technician resources available to the process would decrease the shortage duration. Based on this assumption, the analyst increases the available resources to 10. Subsequent simu lations do not show significant reduction in the resource shortage durations. What steps should the process analyst take to resolve the resource shortage duration and make updates for further process improvement?

  1. Increase the available resources for the Field Technician from 10 to 20 to reduce the resource shortage duration.

  2. Reallocate the defined Field Technicians to additional second shift and weekend shift availability to remove resource shortage duration due to unavailability overnight and during weekends.

  3. Increase the time interval within the simula-tion snapshot settings to spread out the arrival of tokens, allowing more time for the Field Technician to complete work before new work arrives, thereby reducing resource shortage durations.

  4. Decrease the Resource Time Required for activities assigned to the field Technicians, allowing them to spend less time on tasks and be able to address more activities in a given interval, thereby reducing resource shortage durations.

Answer: B

Question No: 6 – (Topic 1)

A process analyst has completed a future state process model andneeds to validate it against process improvement requirements. The future state process must be able to handle 25% more throughput than the current state, while maintaining or improving process duration. Presently, the business process handles 2000 requests daily. Using dynamic analysis, how can the process analyst validate whether the future state process will satisfy these requirements?

  1. 1. Simulate the current state process model at 2000 requests per day.

    1. Simulate the future state process model at 2000 requests per day.

    2. Generate a Processes Duration Comparison report to verify the Average Elapsed Duration of the future state process model reflects a favorable percentage change over the current state process model.

  2. 1. Simulate the current state process model at 2000 requests per day.

    1. Simulate the future state process model at 2500 requests per day.

    2. Generate a Processes Duration Comparison report to verify the Average Elapsed Duration of the future state process model reflects a favorable percentage change over the current state process model.

  3. 1. Simulate the current state process model at 2500 requests per day.

    1. Simulate the future state process model at 2500 requests per day.

    2. Generate a Processes Duration Comparison reportto verify the Average Elapsed Duration of the future state process model reflects a favorable percentage change over the current state process model.

  4. 1. Simulate the future state process model at 2000 requests per day.

  1. Simulate the future state process model at 2500 requests per day.

  2. Generate a Processes Duration Comparison report upon the results of the future state process model to verify the Average Elapsed Duration.

    Answer: B

    Question No: 7 – (Topic 1)

    A new payment process will be used to processtransfer requests in the US and Europe where: 1) payments should be processed on the same day of request Monday to Friday. 2) the number of European and US requests is similar per day during normal working hours. Which option illustrates the input simu lation setting that will help analyze this process?

    1. Set a time trigger to receive requests assigning as start time a general timetable valid for the US and Europe.

    2. Set a time trigger to receive requests using a distribution with a general timetable forthe US and Europe.

    3. Set a timetable trigger to receive requests assigning a general timetable valid for the US and Europe.

    4. Set a timetable trigger to receive requests assigning a custom timetable specifying different periods for the US and Europe.

Answer: D

Question No: 8 – (Topic 1)

A loan business process has an activity that has a role and a resource assigned. The role cost is $100 and the resource cost is $200. When the process is simulated what is the activity total cost?

  1. The role cost ($100).

  2. Theresource cost ($200).

  3. The sum of role and resource cost ($300).

  4. The role cost multiplied by the activity duration.

Answer: B

Question No: 9 – (Topic 1)

A process analyst needs to conduct analysis on cost and duration of marketing related tasks in the currentprocess. In the current process, there are five possible paths. The

process analyst needs to identify the cost and duration of marketing related tasks for each path. The process analyst has decided to create a classifier of Marketing to be assigned to thetasks in the current process. Which analysis should be used?

  1. Activities by classifier analysis.

  2. Classifier cost and duration analysis.

  3. Process case summary analysis.

  4. Process classifier cost and duration analysis.

Answer: D

Question No: 10 – (Topic 1)

Refer to the Exhibit.

Dumps4Cert 2018 PDF and VCE

A process analyst needs to simulate the behavior of the whole business process. How should the simula-tion profile be set to accomplish this requirement?

  1. Set the simula-tion to Evaluate all sub processes.

  2. Set the Maximum number of process invocation to 10.

  3. Set the simula-tion to Use resource time required as a task processing time.

  4. Set the date of the Process availability ends greater than the Process availability begins.

Answer: A

100% Dumps4cert Free Download!
Download Free Demo:C2180-606 Demo PDF
100% Dumps4cert Free Guaranteed!
Download 2018 Dumps4cert C2180-606 Full Exam PDF and VCE

Dumps4cert ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No