EnsurePass
2017 Nov IBM Official New Released C2180-606
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/C2180-606.html

IBM WebSphere Business Modeler Advanced Edition V7.0, Business Analysis and Design

Question No: 11 – (Topic 1)

A company#39;s new approach to selling requires extensive resource planning. A team of process analysts has been assembled to perform this work. Which option is sufficient to enforce consistent simu-lations behavior across the team? All analysts:

  1. set the same random numberseed and process availability start and end dates in the simula-tion profiles.

  2. set the same random number seed, process availability start and end dates, and maximum simula-tion duration in the simula-tion profiles.

  3. set unique random number seed,process availability start and end dates, maximum simula-tion duration and maximum number of process invocations in the simula-tion profiles.

  4. set unique random number seeds and process availability start and end dates in the simula-tion profiles.

Answer: A

Question No: 12 – (Topic 1)

When reviewing the simu-lations results, the process analyst discovered that for each task in the process that has multiple output criteria, the simula-tion engine would make a random selection of an output path, and generate outgoing tokens for each output defined in the output criterion. Which of the following settings was used during the simula-tion?

  1. Randomly to a single path.

  2. Based on an expression.

  3. Based on probabilities to a single path.

  4. Based on probabilities tomultiple paths.

Answer: C

Question No: 13 – (Topic 1)

During an exception period, a resource could not complete a task before the end of the task#39;s processing time. What should be done to ensure that the resource remains allocated until the task is completed?

  1. Check quot;Use resources time required as a task processing timequot;.

  2. Check the preference quot;Run simula-tion without resource requirementsquot;.

  3. Increase the quot;Task durationquot; to match the resource required time.

  4. Set the task#39;s quot;Resource wait timequot; to be the resource shortage time.

Answer: A

Question No: 14 – (Topic 1)

A process analyst has performed simu-lation upon a business process and is analyzing resource allocation within the process. The average elapsed duration for the process is 2 hours, 57 minutes. After running the Process Resource Dynamic Analysis Report, it is observed that the Field Tech Resource has an average Quantity Allocated value of .6 units. The Process Resource Allocation Dynamic Analysis Report is also generated against the simu-lation results, andit is determined that there is an Average Shortage Duration of 37 minutes, 30 seconds for the resource. The process analyst also observes that the Field Tech Resource has been defined to the process as a bulk resource with an availability value of 3. Basedon this information, what conclusions can the process analyst draw?

  1. There is at least one case in the business process that does not allocate the Field Tech Resource. The pool of available Field Tech Resources can be reduced to 1 to eliminate resources that are never allocated to the process. This will not affect the Average Shortage Duration value.

  2. There are too many Field Tech Resources available to the process, as the sum of all Field Tech Resource allocations to activities in the process dividedby the total number of process instances is less than one. This indicates that some Field Tech Resources are never allocated the business process.

  3. There is at least one case in the business process that does not allocate the Field Tech Resource, however there are also multiple concurrent process instances that are allocating the resource concurrently and are competing for the resource. The pool of available Field Tech Resources can be increased to reduce the Average Shortage Duration and the Average Quantity Allocated would increase to a value close to 1.0 units.

  4. There is at least one case in the business process that does not allocate the Field Tech Resource, however there are also multiple concurrent process instances that are allocating the resource concurrently and are competing for the resource. The pool of available Field Tech Resources can be increased to reduce the Average Shortage Duration and the Average Quantity Allocated would remain the same in subsequent simula-tions.

Answer: D

Question No: 15 – (Topic 1)

A model is going to be simu-lated to capture results that represent as close to real conditions as possible. What simu-lation setting should be used to ensure that the results reflect the random nature of the process? The random number seed needsto be set to:

  1. Zero

  2. 1

  3. 2

  4. N

Answer: A

Question No: 16 – (Topic 1)

Which predefined process report shows the sequence of steps within a process and the relationships of a process to other processes?

  1. Process Details Report

  2. Process Procedure Report

  3. Process Specification Report

  4. Process Level Details Report

Answer: B

Question No: 17 – (Topic 1)

To display the names of all tasks in a process model in a table format, what must the process analyst do to accurately define the table after adding the table to the report template?

  1. 1. In the Properties View for the table, populate the Grouped By Field by navigating to and selecting the immediate parent of the data to be displayed.

    1. Select the appropriate table cell.

    2. In the Properties View for the tablecell, populate the Data Field Name by navigating to and selecting the data element to be displayed.

  2. 1. In the Properties View for the table, populate the Grouped By Field by navigating to and selecting the immediate parent of the data to be displayed.

    1. Create a Data Field within the appropriate table cell.

    2. In the Properties View for the Data Field, populate the Data Field Name by navigating to and selecting the data element to be displayed.

  3. 1. In the Properties View for the table, populate the Data Field Path by navigating to and selecting the immediate parent of the data to be displayed.

    1. Select the appropriate table cell.

    2. In the Properties View for the Data Field, populate the Data Field Path by navigating to and selecting the dataelement to be displayed.

  4. 1. In the Properties View for the table, populate the Data Field Path by navigating to and

selecting the immediate parent of the data to be displayed.

  1. Create a Data Field within the appropriate table cell.

  2. In theProperties View for the Data Field, populate the Data Field Path by navigating to and selecting the data element to be displayed.

    Answer: B

    Question No: 18 – (Topic 1)

    Refer to the Exhibit.

    Ensurepass 2017 PDF and VCE

    A process analyst has modeled the current state of a mortgage approval process as shown in the Exhibit. Historical process performance measurements have indicated when there is an error in the filing of the mortgage documentation, the corrective activities increase the process duration by 50% and the process cost by 35%. How can the process analyst prove the current state model reflects this situation?

    1. Assign an exception classifier to each activity associated with incorrectly filed documentation.

      Run simula-tion analysis upon the process and determine its average cost andduration from the simula-tion control panel. Generate the Classifier Cost and Duration report upon the simula-tion results.

      Compare the process#39; average cost and duration against the Classifier report#39;s values.

    2. Assign an exception classifier to each activity associated with incorrectly filed documentation

      Run simula-tion analysis upon the process and generate the Process Cases Summary report.

      Determine which cases represent process instances that perform activities associated with incorrectly filed documentation.

      Compare the average cost and duration of these cases against cases that do not perform these corrective activities.

    3. Run simula-tion analysis upon the process and generate the Processes Cost Comparison report to compare the cost of the processbetween cases that perform corrective activities against those that do not.

      Repeat this comparison for duration by generating and analyzing the Processes Duration

      Comparison report.

    4. Assign an exception classifier to each activity associated with incorrectly filed documentation.

Run simula-tion analysis upon the process and generate the Process Classifier Cost and Duration report.

Compare the total average costs and durations of the exception classifier activities against non-exception activities.

Answer: B

Question No: 19 – (Topic 1)

When is it applicable to use a query?

  1. To extract and view information about the elements of models.

  2. To extract, view and print information about the elements of models.

  3. To extract and view information about model elementsand simula-tion results.

  4. To extract, view, and print information about model elements and simula-tion results.

Answer: A

Question No: 20 – (Topic 1)

Which of the following is an example of a Key Performance Indicator (KPI)?

  1. Supplier response time.Supplier? response time.

  2. Customer Order processing time.

  3. Order must be processed within 3 days.

  4. Working duration of a business process.

Answer: C

100% Free Download!
Download Free Demo:C2180-606 Demo PDF
100% Pass Guaranteed!
Download 2017 EnsurePass C2180-606 Full Exam PDF and VCE

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

2017 EnsurePass IT Certification PDF and VCE